Irrigation, River Training, and Water Resource Sector

Development support Consultant

S.N.Name of ProjectClientStart DateCompleted Date
 1Preparation of a Detailed Feasibility Study Report of Devghat Protection River Training WorksIrrigation Feasibility Study and Construction Quality Program, Department of Water Resource and IrrigationJuly 2020June 2021
Pre-Feasibility Study (Supplementary) of Madi – Dang Diversion ProjectIrrigation Feasibility Study and Construction Quality Program, Department of Water Resource and IrrigationMarch 2021August 2021
Irrigation Area Boundary Mapping and Asset Inventory Survey of Eastern Canal System of Babai Irrigation ProjectBabai Irrigation Project, Department of Water Resource and IrrigationMay 2023July 2023
Irrigation Area Boundary Mapping and Asset Inventory Survey of Patharaiya Irrigation SystemPathariya Mohana Irrigation Management Office, DhangadhiApril 2023July 2023
Detailed Feasibility Study of Lift Irrigation at Western Main Canal, Kachanpur, Balapur & Dhakeri, BankeSikta Irrigation Project, Nepalgunj, BankeMarch 2023May 2023
Detailed Feasibility Study of the 10 No. of Lift Irrigation Projects (392 ha.) and Identification Study of 8 No. of Lift Irrigation Projects (1478.133 ha.) in Syangja and Tanahun District  Water Induced Disaster Control Technology Project, LalitpurMarch 2023May 2023
Preparation of District Irrigation Master Plan of Bhaktapur DistrictWater Resource and Irrigation Development Division, BhaktapurJune 2022November  2022
8Preparation of Detailed Project for Selected Lift Irrigation Sub System of Kavrepalanchowk District Aimaantar Lift Irrigation Sub-Project, Temal Rural Municipality -02, Kavrepalanchowk, 14 HaAmaltari Lift Irrigation Sub-Project, Temal Rural Municipality -01, Kavrepalanchowk, 18 HaKhahareghat Bhottar Lift Irrigation Sub-Project, Temal Rural Municipality -01, Kavrepalanchowk, 10 Ha  Integrated Energy and Irrigation Special ProgramApril 2023June 2023
Office of Hydrology and Meteorology, Kohalpur, BankeDepartment of Water Resource and Irrigation, Integrated Energy and Irrigation Special Program, Pulchowk, LalitpurFebruary 2022July 2022
10 Assessment of Landuse Change in Babai, Rani Jamara Kulariya and Mahakali Irrigation ProjectIrrigation Feasibility Study & Quality Construction Programme, Department of Water Resource and IrrigationMay 2022July 2022
11Detailed Feasibility Study and Report Preparation of Kunjbhoj Lift Irrigation Project (220 ha.)Mahakali Irrigation Project Stage III, Department of Water Resource and IrrigationMarch 2022July 2022
12 Survey and Inundation Area Mapping of Banjarha Area in Ishnath Municipality, RautahatBagmati and Lal Bakaiya River Training ProjectMay 2022July 2022
13 Detail Design for Renovation of Stone Spout and Ponds within Mahalaxmi MunicipalityKathmandu Valley Water Supply Management BoardMarch 2021June 2021
14 Zonation of Groundwater Recharge Area for Current and Future Period Insight of Landuse Landcover and Change in Rainfall Pattern in Urbanized City (Dharan Sub Metropolitan City)Water Resource Research and Development Center, Department of Water Resource and IrrigationJanuary 2022July 2022
15 Preparation of District Irrigation Master Plan of Kathmandu District under Water Resource and Irrigation Development Division Office (WRIDDO), KathmanduWRIDDO Kathmandu  March 2021August 2021
16 Preparation of District Irrigation Master Plan of Lalitpur DistrictWRIDDO Lalitpur  March 2021August 2021
17 Preparation of District Irrigation Master Plan of Ramechhap DistrictWRIDDO Ramechhap  March 2021August 2021
18 Preparation of District Irrigation Master Plan of Dolakha DistrictWRIDDO Dolakha  March 2021August 2021
19 Preparation of District Irrigation Master Plan of Sindhupalchowk DistrictWRIDDO Sindhupalchowk  March 2021August 2021
20 Preparation of District Irrigation Master Plan of Dhading DistrictWRIDDO Dhading  March 2021August 2021
21 Detailed Feasibility Study of Tada Muhan to B. P. Museum Irrigation Project in Nayapati VDC, KathmanduCIDD No. 6, KathmanduApril 2012June 2012
22 Detail Design Study of Bikashe Kulo Irrigation Project, Narikot, PyuthanDoLIDARNovember 2011March 2012
23 Detail Survey (NITP) of Shram Jyoti IPM  Irrigation  Sub  Project and Toshra Irrigation Sub ProjectMid-Western Regional Irrigation Directorate, SurkhetMay 2012June 2012
24 Detail Feasibility Study of Jiulakhet Irrigation Project, DolpaMWIDO No. 5, JumlaMarch 2012May 2012
 25Engineering Consultancy Services for Rapid Appraisal Report Preparation of Block 1 of  Narayani Irrigation SystemDepartment of IrrigationApril 2011June 2011
 26Detail Survey, Design of Garam Kulo Irrigation ProjectCIDD No – 6, DOI, KathmanduMarch 2011May 2011
 27Pre Feasibility Study, Preparation of Sub Project, Implementation Plan and Submitting Sub Project Preparation Report (SPPR) of Shera Kulo Irrigation Sub Project, Lubhu VDC Lalitpur and Tika Bhairab Khelbu Kuchhabu Irrigation Sub Project, Chhampi VDC, Lalitpur, CMIASPCIDD No – 6, DOI, KathmanduApril 2011July 2011
 28Detailed Survey, Design of Kalagad Irrigation Project, Jair VDC, HumlaMWDD No. 5, JumlaSeptember 2010November 2010
 29The Mid-Term Impact Assessment of Lothar Sub-Watershed WID Mitigation Project, ChitwanDWIDPMay 2012June 2012
 30Review and Assessment of Training and Institutional Strengthening Activities Conducted under Component B of the Irrigation and Water Resource Management Project (IWRMP) of Kankai Irrigation System (KIS), JhapaIWRMPOctober 2012February 2013
 31Detail Design Study of Toribari Nunsari Small Irrigation Project, Sakfora, IlamDoLIDAROctober 2012December 2012
 32Scheme verification survey using GPS of Irrigation Project Under Kavreplanchowk and Sindupalchowk DistrictCIDD No. 7, DOI, KavreOctober 2012November 2012
 33Benchmarking Study of Sunsari Morang Irrigation ProjectIWRMPNovember 2013January 2014
 34Detailed Feasibility Survey of Namdo ISP, DolpaDOI, DolpaJune 2016July 2016
 35Detailed Survey and Preparation of Detailed Estimate of Narayani Irrigation System, Block-2, BSC BranchesIWRMPMay 2014June 2014
 36Performance Evaluation of Sub Project (Sunsari-Morang Irrigation System, Sitagunj Branch) under component B of IWRMPIWRMPApril 2012June 2012
 37Detailed Study of Rehabilitation Narayani Lift Irrigation System (4700 ha)CIDD -5, Chitwan, DOIFebruary 2011August 2011
 38Detail Feasibility Study of Pikhuwa Khola Micro Hydro Project, Bala VDC Ward No. 4, 7 and Likhu Khola Micro Hydro Project, Sankhuwasabha DistrictDoLIDARApril 2014May 2014
 39The Preparation of Physical Status Inventory of Irrigation System under Large Government Irrigation Rehabilitation & Management Transfer Project, Kamala Irrigation System, Eastern Canal, Siraha DistrictSMTP, DOIMay 2014June 2014
 40Detailed Topographic Survey, Establishment of Mean Sea Level Benchmark in 15 Hydrological Station (Karnali and Bheri River Basin)Office of Hydrology and Meteorolog, Kohalpur, BankeMarch 2023July 2023
 41Preparation of Station Inventory and Cross Section Survey for Koshi and Karnali River BasinDepartment of Hydrology & MeteorologyApril 2012June 2012
 42Discharge Measuring Work, DHMDHMApril 2014May 2014