1 | Preparation of a Detailed Feasibility Study Report of Devghat Protection River Training Works | Irrigation Feasibility Study and Construction Quality Program, Department of Water Resource and Irrigation | July 2020 | June 2021 |
2 | Pre-Feasibility Study (Supplementary) of Madi – Dang Diversion Project | Irrigation Feasibility Study and Construction Quality Program, Department of Water Resource and Irrigation | March 2021 | August 2021 |
3 | Irrigation Area Boundary Mapping and Asset Inventory Survey of Eastern Canal System of Babai Irrigation Project | Babai Irrigation Project, Department of Water Resource and Irrigation | May 2023 | July 2023 |
4 | Irrigation Area Boundary Mapping and Asset Inventory Survey of Patharaiya Irrigation System | Pathariya Mohana Irrigation Management Office, Dhangadhi | April 2023 | July 2023 |
5 | Detailed Feasibility Study of Lift Irrigation at Western Main Canal, Kachanpur, Balapur & Dhakeri, Banke | Sikta Irrigation Project, Nepalgunj, Banke | March 2023 | May 2023 |
6 | Detailed Feasibility Study of the 10 No. of Lift Irrigation Projects (392 ha.) and Identification Study of 8 No. of Lift Irrigation Projects (1478.133 ha.) in Syangja and Tanahun District | Water Induced Disaster Control Technology Project, Lalitpur | March 2023 | May 2023 |
7 | Preparation of District Irrigation Master Plan of Bhaktapur District | Water Resource and Irrigation Development Division, Bhaktapur | June 2022 | November 2022 |
8 | Preparation of Detailed Project for Selected Lift Irrigation Sub System of Kavrepalanchowk District Aimaantar Lift Irrigation Sub-Project, Temal Rural Municipality -02, Kavrepalanchowk, 14 HaAmaltari Lift Irrigation Sub-Project, Temal Rural Municipality -01, Kavrepalanchowk, 18 HaKhahareghat Bhottar Lift Irrigation Sub-Project, Temal Rural Municipality -01, Kavrepalanchowk, 10 Ha | Integrated Energy and Irrigation Special Program | April 2023 | June 2023 |
9 | Office of Hydrology and Meteorology, Kohalpur, Banke | Department of Water Resource and Irrigation, Integrated Energy and Irrigation Special Program, Pulchowk, Lalitpur | February 2022 | July 2022 |
10 | Assessment of Landuse Change in Babai, Rani Jamara Kulariya and Mahakali Irrigation Project | Irrigation Feasibility Study & Quality Construction Programme, Department of Water Resource and Irrigation | May 2022 | July 2022 |
11 | Detailed Feasibility Study and Report Preparation of Kunjbhoj Lift Irrigation Project (220 ha.) | Mahakali Irrigation Project Stage III, Department of Water Resource and Irrigation | March 2022 | July 2022 |
12 | Survey and Inundation Area Mapping of Banjarha Area in Ishnath Municipality, Rautahat | Bagmati and Lal Bakaiya River Training Project | May 2022 | July 2022 |
13 | Detail Design for Renovation of Stone Spout and Ponds within Mahalaxmi Municipality | Kathmandu Valley Water Supply Management Board | March 2021 | June 2021 |
14 | Zonation of Groundwater Recharge Area for Current and Future Period Insight of Landuse Landcover and Change in Rainfall Pattern in Urbanized City (Dharan Sub Metropolitan City) | Water Resource Research and Development Center, Department of Water Resource and Irrigation | January 2022 | July 2022 |
15 | Preparation of District Irrigation Master Plan of Kathmandu District under Water Resource and Irrigation Development Division Office (WRIDDO), Kathmandu | WRIDDO Kathmandu | March 2021 | August 2021 |
16 | Preparation of District Irrigation Master Plan of Lalitpur District | WRIDDO Lalitpur | March 2021 | August 2021 |
17 | Preparation of District Irrigation Master Plan of Ramechhap District | WRIDDO Ramechhap | March 2021 | August 2021 |
18 | Preparation of District Irrigation Master Plan of Dolakha District | WRIDDO Dolakha | March 2021 | August 2021 |
19 | Preparation of District Irrigation Master Plan of Sindhupalchowk District | WRIDDO Sindhupalchowk | March 2021 | August 2021 |
20 | Preparation of District Irrigation Master Plan of Dhading District | WRIDDO Dhading | March 2021 | August 2021 |
21 | Detailed Feasibility Study of Tada Muhan to B. P. Museum Irrigation Project in Nayapati VDC, Kathmandu | CIDD No. 6, Kathmandu | April 2012 | June 2012 |
22 | Detail Design Study of Bikashe Kulo Irrigation Project, Narikot, Pyuthan | DoLIDAR | November 2011 | March 2012 |
23 | Detail Survey (NITP) of Shram Jyoti IPM Irrigation Sub Project and Toshra Irrigation Sub Project | Mid-Western Regional Irrigation Directorate, Surkhet | May 2012 | June 2012 |
24 | Detail Feasibility Study of Jiulakhet Irrigation Project, Dolpa | MWIDO No. 5, Jumla | March 2012 | May 2012 |
25 | Engineering Consultancy Services for Rapid Appraisal Report Preparation of Block 1 of Narayani Irrigation System | Department of Irrigation | April 2011 | June 2011 |
26 | Detail Survey, Design of Garam Kulo Irrigation Project | CIDD No – 6, DOI, Kathmandu | March 2011 | May 2011 |
27 | Pre Feasibility Study, Preparation of Sub Project, Implementation Plan and Submitting Sub Project Preparation Report (SPPR) of Shera Kulo Irrigation Sub Project, Lubhu VDC Lalitpur and Tika Bhairab Khelbu Kuchhabu Irrigation Sub Project, Chhampi VDC, Lalitpur, CMIASP | CIDD No – 6, DOI, Kathmandu | April 2011 | July 2011 |
28 | Detailed Survey, Design of Kalagad Irrigation Project, Jair VDC, Humla | MWDD No. 5, Jumla | September 2010 | November 2010 |
29 | The Mid-Term Impact Assessment of Lothar Sub-Watershed WID Mitigation Project, Chitwan | DWIDP | May 2012 | June 2012 |
30 | Review and Assessment of Training and Institutional Strengthening Activities Conducted under Component B of the Irrigation and Water Resource Management Project (IWRMP) of Kankai Irrigation System (KIS), Jhapa | IWRMP | October 2012 | February 2013 |
31 | Detail Design Study of Toribari Nunsari Small Irrigation Project, Sakfora, Ilam | DoLIDAR | October 2012 | December 2012 |
32 | Scheme verification survey using GPS of Irrigation Project Under Kavreplanchowk and Sindupalchowk District | CIDD No. 7, DOI, Kavre | October 2012 | November 2012 |
33 | Benchmarking Study of Sunsari Morang Irrigation Project | IWRMP | November 2013 | January 2014 |
34 | Detailed Feasibility Survey of Namdo ISP, Dolpa | DOI, Dolpa | June 2016 | July 2016 |
35 | Detailed Survey and Preparation of Detailed Estimate of Narayani Irrigation System, Block-2, BSC Branches | IWRMP | May 2014 | June 2014 |
36 | Performance Evaluation of Sub Project (Sunsari-Morang Irrigation System, Sitagunj Branch) under component B of IWRMP | IWRMP | April 2012 | June 2012 |
37 | Detailed Study of Rehabilitation Narayani Lift Irrigation System (4700 ha) | CIDD -5, Chitwan, DOI | February 2011 | August 2011 |
38 | Detail Feasibility Study of Pikhuwa Khola Micro Hydro Project, Bala VDC Ward No. 4, 7 and Likhu Khola Micro Hydro Project, Sankhuwasabha District | DoLIDAR | April 2014 | May 2014 |
39 | The Preparation of Physical Status Inventory of Irrigation System under Large Government Irrigation Rehabilitation & Management Transfer Project, Kamala Irrigation System, Eastern Canal, Siraha District | SMTP, DOI | May 2014 | June 2014 |
40 | Detailed Topographic Survey, Establishment of Mean Sea Level Benchmark in 15 Hydrological Station (Karnali and Bheri River Basin) | Office of Hydrology and Meteorolog, Kohalpur, Banke | March 2023 | July 2023 |
41 | Preparation of Station Inventory and Cross Section Survey for Koshi and Karnali River Basin | Department of Hydrology & Meteorology | April 2012 | June 2012 |
42 | Discharge Measuring Work, DHM | DHM | April 2014 | May 2014 |